July 05
Progress,  page 65
Installing glass block in a cramped opening is a total pain in the butt.  Four relatively small
openings took a total of about six days to complete.  At least they don't leak.

These two windows are in our son's bathroom.
And these two are in the shower portion of the master bathroom.

At least they haven't broken so far.  I was a little worried about that (still am) because the
blocks are mounted inside a concrete opening and I wasn't able to include any kind of
expansion joint to account for thermal expansion/contraction.  I'm hoping that the glass area is
small enough that whatever stresses occur aren't enough to cause a problem.
Our house is currently a virtual advertising billboard for your products.  
  
Send check ASAP.
Special note to E. I. DuPont: