Progress,  page 77
Below are pictures of the entry overhang and the one near Eric's bedroom with the plywood
sheathing.  They have since been covered with Tyvek membrane, after which we spent several
weeks waterproofing all four of the overhangs with a double sandwich of an elastomeric coating
and a polyester mesh.
Eric's patio overhang.
Main entry overhang.
And here is a current "aerial view" of the house from high on the ridge above.  Everything is water
tight and we are now putting the stucco mesh on the house.  I expect that will take us another
several weeks to finish.  Sigh ...