Progress,  page 92
Here is the cabinet roughout for the east wall of the kitchen.  We had to make the section for the
dual Thermidor oven especially strong ... the darn thing was so heavy we had to raise it on a
pallet in lifts with a prybar and lumber, then slide it into place.
This is the cabinet roughout on the north wall of the kitchen ... basically just two sections for
shelves and an open center section for leg room when sitting at the counter.
The raised floor was built from 2x4's glued on edge to the slab, with 3/4 inch plywood glued and
screwed to them.  We glued a sample of each of our favorite beverages to the floor for posterity.